Programming PLCs: IEC 61131-3, response time and function blocks
The five languages, worst-case response time proved with an example, tasks and priorities, a function block in structured text, good design and…
Library
586 articles
The five languages, worst-case response time proved with an example, tasks and priorities, a function block in structured text, good design and…
Steps, transitions and actions, evolution rules, a drilling station, translation into code with a single active step proved, divergences, interlocks and operating…
Why a current, live zero and NAMUR, the loop voltage budget proved with an example, HART, sensor parameters, encoder quadrature and Gray…
The ISA-95 automation pyramid, V life cycle and requirements traceability, availability with MTBF and MTTR, components in series and in parallel proved…
Hardware protection, the Popek and Goldberg theorem, type 1 and 2 hypervisors, the cost of nested page tables proved, namespaces and cgroups,…
Periodic tasks, the utilisation condition proved, optimal EDF, the Liu and Layland bound, response time analysis with an example, priority inversion and…
Contiguous, linked and indexed allocation, maximum size with the inode proved, directories and links, permissions, consistency with journaling, wear leveling and TRIM.
Cost of page faults with an example, FIFO, optimal and LRU, Belady's anomaly, the stack property of LRU proved, the clock algorithm,…
Coffman's four conditions, the allocation graph and the cycle criterion proved, resource ordering proved, the banker's algorithm with an example, dining philosophers.
Race conditions, critical section requirements, Peterson's mutual exclusion proved, test-and-set and CAS, semaphores, producer and consumer, monitors.